Client
STRABAG AG
Location
Austria / Kärnten
Duration
2015
Services
Survey, visualization
The aim of the project was to determine the mass of desedimentation of the Gössnitz / Möll reservoir.
Within the project a survey with echo sounder was performed. From the survey data a DGM for cubature determination was created.