Client
Government of Carinthia
Location
Austria / Carinthia
Duration
2008 - 2013
Services
Vermessung, hydraulische Modellierung, Erstellung einer Abflussuntersuchung und Gefahrenzonenplanung
Survey and digital terrain modelling for hydraulic numerical 2D analysis. The overall project objective was a run-off study and hazard zone mapping.
Run-off study and hazard zone mapping for the upper river Drau. Surveying and hydraulic modelling 2D, scenario investigation of bedload, preparation of a hazard zone plan according to applicable guidelines for the municipalities of Oberdrauburg, Irschen, Dellach, Berg, Greifenburg, Steinfeld, Kleblach-Lind, Sachsenburg, Lurnfeld, Baldramsdorf, Lendorf and Spittal/Drau. Creation of a GIS project.
River length in project: app. 70 km
HQ100 : 1000 m³/s – 1650 m³/s
12 municipalities